(+84) 789 75 77 88
Nam Dinh Vu IP
Hai Phong, North Vietnam
170,000 m2
60,000 m2
Min 2,500 m2 (Factory)
Min 5,000 m2 (Warehouse)
Optimal for
Storage & Production
EDGE Certified
Solar roof initiative
Multiple Access
Incentives
Q2/2023
2,000,000 ppl
FY2021 | Source: Hai Phong IZA
52.3 %
FY2021 | Source: Hai Phong IZA
Zone 1
FY2021 | Source: Hai Phong IZA
4,420,000 VND
FY2021 | Source: Hai Phong IZA
Max 200 KVA/unit
3-phase power
4,800 m2
Warehouse: 9.5m
Office: 2.8m
1.2m brick wall with louver and metal sheeting cladding with skylight above
1.3m
25 x 16m
Warehouse: 3 tons/m2
Office: 300k/m2
Ceiling hanging: 20kg/m2
Hydraulic type, 6 tons capacity
Sprinklers, Fire alarm, Smoke detectors, Fire hydrants, Portable fire extinguishers, Smoked exhausted fan
24/7
Max 600 KVA/unit
3-phase power
2,500m2
Factory: 6.5m
Office: 2.8m
1.2m brick wall with louver and metal sheeting cladding with skylight above
51m span column free, 8m spacing for side columns
3m wide x 4.5m high
Factory: 2 tons/m2
Office: 300kg/m2
Ceiling hanging: 20kg/m2
Sprinklers, Fire alarm, Smoke detectors, Fire hydrants, Portable fire extinguishers
24/7
approx. 100 km
approx. 80 mins
18 Highway
approx. 49 km
approx. 48 mins
18 Highway
approx. 15 km
approx. 25 mins
18 Highway
approx. 11 km
approx. 15 mins
Tan Vu – Lach Huyen Bridge
approx. 16 km
approx. 28 mins
5A Highway
approx. 13 km
approx. 20 mins
Ha Noi – Hai Phong Expressway
approx. 130 km
approx. 110 mins
5A Highway
approx. 122 km
approx. 100 mins
Hanoi – Hai Phong Expressway
10% for the first 15 years
FY2021. Source: Hai Phong IZA
0% first 4 years | 50% deduction for the next 9 years
FY2021. Source: Hai Phong IZA
0% for Export Processing Enterprises
FY2021. Source: Hai Phong IZA
0% for Export Processing Enterprises
FY2021. Source: Hai Phong IZA