Ha Nam Province, Northern Vietnam
860 km2
944,200
70%
10.82% (2022)
134,320 billion VND (US$ 5.84 billion) (2022)
357 (2022)
116,228 billion VND (US$ 5 billion) (2022)
135,000 billion VND (US$ 5.87 billion) (2022)
Dong Van Industrial Park, Ha Nam Province
160,000 m2
Factory: November 2023
Warehouse: February 2024
Optimal for storage & production
Maximum 15m, 4 lanes
6 gates
On-site energy reduction
400m3/day
Parking Area, Truck Court, Canteen
9,118 M2
Feb 2024
270 KVA/ unit, 3-phase power
Min 10.0m for warehouse area & 2.8m for office area.
Metal sheet (Seam lock/Clip lock ) with insulation layer.
6m wide along loading platform
1.2m brick wall at bottom and metal sheet cladding above.
On side walls
3 tons/sqm loading capacity, reinforced concrete slab with powder hardener coating.
9m spacing for side columns & 16m spacing for side columns
Fire sprinkler system, fire hose reels, hydrants & smoke detectors, fire alarm system, portable fire extinguishers, smoke extraction fans. (*)
2,446 M2
Unit 1-2: Nov 2023
Unit 4-5-6: Feb 2024
490-570 KVA/ unit, 3-phase power
Min 6.5m for factory area & 2.8m for office area.
Metal sheet (Seam lock/Clip lock ) with insulation layer
6m wide at main entrance
1.2m brick wall at bottom and metal sheet cladding above.
On side walls
2 tons/sqm loading capacity, reinforced concrete slab with powder hardener coating.
Unit 1-2: 44m span column free, 8.5m spacing for side columns
Unit 4-5-6: 39m span column free, 9m spacing for side columns
3m (W) x 4.5m (H)
Fire sprinkler system, fire hose reels, hydrants & smoke detectors, fire alarm system, portable fire extinguishers.
approx. 50 km (60 mins)
approx. 80 km (70 mins)
approx. 130 km (100 mins)
approx. 120 km (100 mins)
approx. 130 km (100 mins)
0% first 2 years
50% of current applied
tax rate next 4 years
0% max. 4 years
50% of current applied
tax rate next 9 years
0% max. 3 years with no profit
0% next 4 years