Fire sprinkler system
4 tons/m2 with concrete hardener
11.4 m
12 m
Width: 6 m
1.5 m
Maximized storage area
Security assurance
Capacity ~20 - 50 bikes
Width: 30 - 33 m
Capacity 400 persons
CCTV & lighting in common area
approx. 34 km
approx. 76 mins
13 Highway
approx. 33 km
approx. 68 mins
13 Highway
approx. 44 km
approx. 100 mins
13 Highway
approx. 74 km
approx. 115 mins
51 Highway
approx. 66 km
approx. 102 mins
51 Highway
approx. 54 km
approx. 84 mins
51 Highway
Size | ~5,000 – 20,000 m2 |
---|---|
Electrical Provision | 250 ~ 500 KVA 3-phase power per unit |
Roof | Stainless metal sheet with 2 aluminum air bubble insulation layers and skylight |
Wall | 1.2 m brick wall & ~ 14.8 m stainless metal cladding on top |
Ventilation | Ventilation louvers at both side of the warehouse |
Roller Shutter | 2.6 m (W) x 3.1 m (H) |
Ramp | 5 pcs |
Lighting | For external area:
• Loading Unloading Bay: 50 Lux • External Driveway: 20 Lux • Toilet: 200 lux |
Lease Term | 3 – 5 years |
Category | Description | Remark |
---|---|---|
Power System | • Electricity supplied from 3 capacity 2x63MA – 110/22kV transformer substations for Industrial Park
• Power supplied from 2 separate sources to avoid • Standard main distribution board for connecting |
(*) Off-peak hours: 1,007 VND/kWh (**) Normal hours: 1,555 VND/kWh (***) Peak hours: 2,871 VND/kWh |
Water System | Capacity 150.000 m3/ day-night. | |
Waste Water Treatment | Wastewater is equal to 80% of the clean water use | |
Telephone/ Internet System |
Available telecommunication infrastructure of Viettel and VNPT. | Tenant signs contract directly with their own supplier. |
Garbage | Pricing subjects to 3rd party supplier | Tenant signs contract directly with their own supplier |
* Off-peak hours |
---|
Applying for all days from 22:00 – 04:00 next day |
** Normal hours | |
---|---|
Monday to Saturday | From 04:00 – 09:30 From 11:30 – 17:00 From 20:00 – 22:00 |
Sunday | From 04:00 – 22:00 |
*** Peak hours | |
---|---|
Monday to Saturday | From 09:30 – 11:30 From 17:00 – 20:00 |
Sunday | No peak hours |
FY 2019 | Labor Supply (persons) | Immigration rate (%) |
---|---|---|
Binh Duong | 1,500,000 | 50% |
Zone | Minimum Salary |
---|---|
Zone 1 | 4,420,000 VND (~190 USD) |